      In Project discussion on Jan 17, 2018 including review of RFC 8204, we identified the following five areas to improve the Soak tests:

      1. A new Pre-requisite test for Traffic Generator stability, primarily intended for SW implementations but applicable for all.
      2. The Throughput Pre-requisite test should include a 5 minute verification of the result
      3. The Throughput Pre-requisite test should provide the Load in Frames per second, using a frame size which did not achieve maximum theoretical throughput on the Interfaces used.
      4. The RFC 2889 Max Frame Rate Metric shall be measured every 5 minutes during the test, along with the Loss count (or ratio), and these results shall be recorded.
      5. The test shall terminate (or inform/interrupt the test operator in some way) when loss ratio exceeds 10^-7 (or other threshold chosen in advance and recorded with the test results.

       

            acm Al Morton
            acm Al Morton
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

              Created:
              Updated:
              Resolved:

                Estimated:
                Original Estimate - 2 weeks
                2w
                Remaining:
                Remaining Estimate - 2 weeks
                2w
                Logged:
                Time Spent - Not Specified
                Not Specified